Well, starting tomorrow I have some time off from work. I've been work 14-16 hour days for the last 3 weeks(110 hours this past week). Over the past couple months I've been collecting parts and haven't had time to install them. Well next week I'll be working on the Grey GT. Here's a list of what I have planed:
Install STEEDA X2
ball joints
Install STEEDA
Bumpsteer kit
Install STEEDA Billet sway-bar mounts
Install new sway-bar end links
Install new Polyurethane
Steering rack bushings
Install new Polyurethane Motor & Trans mounts
Install new oil
dipstick tube (bent the old one)
Install new header
gaskets (got a leak)
Install new rear
upper control arm bushings
Install new rear
adjustable shocks
Install new slotted
brake rotors
Install new brake
pads
Install new Volt & Air
Temp gauges and move & rewire other gauges
Install STEEDA
alternator bracket
Rotate tires
Oil change
Paint rear brake
calipers red
]]>